APEX at Perry Crossing
RZ-20-097: Petition for zone map change of 27.15 acres from GC and I2 to R6: High Density Residential
PP-20-110: Subdivision and resubdivision of approximately 29.64 acres into two lots, one lot, approximately 27.15 acres to be zoned R6 and the other lot, approximately 2.49 acres, to remain General Commercial
DP-20-111: Architectural and Site Design Review of a proposed multi-building apartment complex with 294 units on 27.15 acres of land proposed to be rezoned to R6, including Development Incentives to increase the density above 8 dwelling units per acre.
Location: Corner of City Center Way and Plainfield Commons Drive.
Hearing Information
Date: October 5, 2020, November 2, 2020
Time: 6:30 p.m.
Location: Plainfield Fire Territory Headquarters, 591 Moon Road, Plainfield
Meeting may be held via Teleconference
Public Comment Information
Staff Contact Information
Eric Berg, AICP, Senior Planner, email Eric
Plan Commission Staff Report (issued 10/28)
Design Review Committee Staff Report (issued 9/25)
Disposition
To be determined
Engineer and Contact Person
American Structurepoint, Inc.
Justin Olashuk, email Justin
9025 River Road, Suite 200
Indianapolis, IN 46240
Applicant and Owner
Sila Perry, LLC
Jeff Reasner, email Jeff
706 Pro-Med Lane, Suite #260
Carmel, IN 46032
Attorney
Tuohy Bailey & Moore LLP
Brian J. Tuohy, email Brian
50 South Meridian Street, Suite 700
Indianapolis, IN 46204
Architect
Humphreys @ Partners Architects
Brad Lutz, email Brad
121 W. Wacker Drive, Suite 1900
Chicago, IL 60601
Architectural renderings and unit mix (updated 10/26)
Chain Link Double Swing Gate Detail (updated 10/26)
Stop Control Evaluation (traffic) (added 10/27)
Photometric Plans (updated 10/26)
Photometric Cut Sheets (update 10/26)
Narrative
Area Map
Site Plan, page 1, page 2 (updated10/26)
Primary Plat (updated 10/27)
Landscape Plan (updated 9/21)
Sign Package (updated 9/28)
Condenser Specs (added 10/26)
Traffic Study (added 10/26)
Conceptual Utility Plans (updated 9/21)
Conceptual Grading Plans (updated 9/21)
Impact on Public Sanitary Sewer and Water Utilities Worksheet