What stormwater drainage improvements is the Town making?
Recently the Town identified 5 key projects based upon recommendations from the Department of Public Works and the Town Engineer. The intent is to make additional improvements following the completion of the 5 key projects as funds become available. The projects are intended to accomplish the following objectives:
  1. Alleviate neighborhood and street flooding to resolve numerous drainage problems.
  2. Assist neighborhoods undergoing septic conversions with drainage improvements.
  3. Reduce the frequency and duration of combined sewage overflows by improving neighborhood drainage, and thereby reducing stormwater inflow and infiltration into the sanitary sewer system.
  4. Meet the regulatory requirements of the National Pollution Discharge Elimination System permit as regulated by the Indiana Department of Environmental Management and the U.S. Environmental Protection Agency.