TOWN OF PLAINFIELD PLAN COMMISSION
(Continued from November 7, 2005)
November 10, 2005
The Plainfield Plan Commission met on Thursday, November 10, 2005 at 6:30 p.m. as a continuation of the meeting from Monday, November 7, 2005. In attendance were Mr. Thibo, Mr. McPhail, Mr. Brandgard, Ms. Whicker, Mr. Kirchoff and Mr. Matrana.
ROLL CALL/DETERMINATION OF QUORUM
Mr. Carlucci administered the Roll Call.
PLEDGE OF ALLEGIANCE
OATH OF TESTIMONY
Mr. Daniel administered the Oath of Testimony.
PUBLIC HEARINGS
Mr. Matrana reviewed the Guidelines Governing the Conduct of Public Hearings. At this time I would like to ask Mr. Valanzano if there would be any changes tonight in the sequence of the petitions to be heard?
Mr. Valanzano said what I would like to do first of all is ask if there is anybody in the audience on RZ-05-018, a petition by the Town of Plainfield at 942 South Raceway Road. That petition we found out late yesterday afternoon that there was an error in the notice that was sent out to an adjacent property owner. It was due to error records in the County. So, the immediate adjacent property owner was not given notice. So, we would ask that this petition be continued to the December hearing of the Plan Commission with notice being required to be sent to that individual property owner.
Mr. Brandgard made a motion to continue RZ-05-018, Town of Plainfield at 942 South Raceway Road to the December Plan Commission meeting. Second by Mr. Kirchoff. Motion carried.
Mr. Valanzano said secondly, if you don’t mind, you might want to juggle the order of the petitions that you have on your agenda a little bit. The first change that I would suggest making is hearing the conclusion of the Special Request for Primary Plat, PP-05-006 as the public hearing had been closed on that matter. I believe Mr. Daniel has some comments that he would like to make and then it is at the Plan Commission’s pleasure as to how they want to proceed with that one.
The second change that I might suggest is the first petition you have on your agenda is for DP-05-027 for Joyce Hoyt. We might want to move that to last. The reason being I believe they were under the impression that the meeting was to start at 7:30 tonight. So, we might just want to move that to the end and give them time to get here, if you don’t mind. With that I believe we can move to the continuation hearing for the Special Request for Primary Plat PP-05-006 for Plainfield Crossing, LLC.
Mr. Daniel said if you will recall last Monday night, we commenced the public hearing on this and closed the public hearing. After that there was some discussion about the motion that might be appropriate under the circumstances. That has been continued. There has been discussions between myself, Mr. Comer and Roy O’Brien regarding an appropriate motion to deal with the issues that were discussed at some length after the public hearing was closed. We have provided to the Plan Commission this evening the proposed motion if the Plan Commission is prepared to act on that petition. I don’t believe any objections have been made, as a matter of record, in this proceeding. So, I believe it is ready to go forward if the Commission is ready. If you have any questions, I would be glad to answer them.
Mr. Kirchoff asked, do you believe this protects all parties and allows us to move forward?
Mr. Daniel said yes.
Mr. Kirchoff made a motion that the Plan Commission approve a modification to Condition #3 imposed at the July 11, 2005 public hearing on PP-05-006 to read as follows:
Second by Mr. Brandgard. Roll call vote called.
Mr. Thibo – yes
Mr. McPhail – yes
Mr. Brandgard – yes
Ms. Whicker – yes
Mr. Kirchoff – yes
Mr. Matrana – yes
6-ayes, 0-opposed, 1-vacancy, 0-absent. Motion carried.
Mr. Matrana said at this time the next order of business before the Plan Commission shall be DP-05-032, NAI Olympia Partners.
Mr. Valanzano said the next petition is for Development Plan Review for Architectural and Site Design Review for review and approval for approximately a 12,736 square foot retail building to be located on Lot 3 of the Plainfield Commerce Center. If you look at the graphics on the first page of the Staff Report, you can see the three lots along Quaker Boulevard, this being the middle lot. If you recall, we had a Development Plan approval not too long ago that said Lots 2; 3 and 4 would be subject to sharing property lines for access and parking in exchange for doubling landscaping around the perimeter and around the buildings. This lot is the middle of those three lots.
With respect to the Site Plan, as indicated in the Staff Report, it does comply with the ordinance at this time. It does comply with the recommendations of the Design Review Committee. Just so that you know the Design Review Committee had asked for three changes in the site design. One had to do with additional zoning in the back of the property. One had to do with the relocation of the trash enclosure and the other one had to do with the addition of some pedestrian routes through the property. All those changes have been made and a couple of those points I will get too a little more in detail.
The primary building will look very similar to the building that I have the photograph up on. The main difference is this would be the center feature of the building that would be developed in Plainfield. Step down to about this point, this is a larger point. It has an extra space on it. When I looked at that, I was a little bit concerned about this being the big end of the building but realizing the building will be built here and will come from a center feature down to approximately there I really didn’t have a concern how the design was going to look. It was going to be a little bit less scaled, a smaller scale than this one. And then based on that the amount of features that are being added to that central portion of the building will stand out more and be more predominate. So, the Design Review Committee is comfortable with the materials, the “Quik Brick” material that you see the samples of down at the bottom, those are the actual colors, and how the building was going to look.
The Design Review Committee did request some questions of the petitioner regarding the canvas awnings to be used on the building. The petitioner indicated that they would have an owner’s association or the responsibility of the landlord to make sure those are kept up-todate and kept refreshed and looking clean and looking new. I indicated a life expectancy of about five years each and it would be their responsibility to keep them up-to-date as times goes on.
In terms of landscaping their landscaping plan has been revised. It is consistent with the landscape plan from Monroe Bank and complies with the Development Incentives’ requirements.
Their lighting plan, for the parking lot lights and the building lights, comply. They are going to be using an architectural feature in front of the building. It is only a 100-watt feature. It will potentially be a little bit of a bulb exposed on the bottom but it will be a 100-watt architectural light. Hopefully, it won’t be as bright as what we have seen on the bank over here and won’t cause a glare. Based on the wattage DRC was comfortable with that light selection.
The signs are going to be what we asked for in the ordinance, the individual illuminated channel letters.
On the pedestrian connectivity the only point is at the northwest corner of the site that is really kind of a minor thing but they made all of the connection that we were asking for. My only comment has to do with this connection at this point. Since they are putting in all the infrastructure for the park and they are bringing the sidewalks up and showing the paint striping across I think this little corner needs to be put in as part of the infrastructure of the whole development of the subdivision. You will have all these streets built. Everything will be in place. This lot comes in and these have to come over here and put a link on this side. It seems like this small pedestrian connection should be part of the overall infrastructure improvements with the initial development.
With that the only other thing that I wanted to mention to you is when we looked at this plat initially, and there was discussion about private streets going through here or public streets, we don’t have a problem with it being private. As you see on the Staff Report, to the right of Lot 4 going across the common area the street was originally shown to come through here and this was going to be a full access point. The street was going to come down here. Based on that this is clearly an interior access drive. There is no question about the trash enclosure being located in this area whether it be a private street or public. At the very last minute when this plan was being reviewed, they said we don’t think we are going to build this road anymore, we are going to bring the main traffic here and then down. So, based on the increased traffic volume here let’s move the dumpster out of this corner and move it more centrally so we can also provide screening for the loading dock. I just want to let you know what I did is interpret this to be an interior access drive as opposed to any street. So, that the enclosure can be there. Based on the increased traffic flow in there I just wanted to raise that to your attention. If you have any concern about that, we can make some adjustments to the Staff’s plan. If not, that was the interpretation I made and we can just go forward with it. Really those are the only comments I have on this and beyond that I would be happy to answer any questions that you might have.
Mr. Brandgard said just a comment to your interpretation I guess I don’t have any major problems with it as long as we have it recorded somewhere. So, if it ever becomes a question sometime, we have it down.
Mr. Jack Lashenik said I would just like to add a few comments to Mr. Valanzano’s presentation. Mr. Valanzano did a great job. One thing that I wanted to elaborate on is we shifted the dumpster slightly in the rear and we have also added an additional landscaping, evergreens and spruces along here to shield that in addition to slightly moving it to the corner. That added landscaping was also added, which conforms with the landscaping approval. Other than that I would be happy to answer any questions that you might have. As far as connectivity, we are going through an infrastructure design plan review with the Town and that information has been incorporated to the documents. However, they are going through the review process right now by the engineers.
Mr. McPhail asked, is your engineering and development far enough along where the retention ponds are defined as they are on this site?
Mr. Lashenik said toward the northwest corner of the site that is a true statement. As far as Lot 10, there may be an opportunity for an industrial developer to come in. We may be able to revise the location of the ponds. However, the surface area of the overall site, that drainage and detention service area accommodates for the development of the overall site.
Mr. McPhail asked, which ones are set?
Mr. Lashenik said it will be this pond, these ponds here. Those are set.
Mr. McPhail said the eastern part of this site have you requested rezoning of that?
Mr. Lashenik said I think it was tabled until the December 5th hearing.
Mr. McPhail asked, has the Monroe Bank started anything on the site yet?
Mr. Valanzano said no sir. My understanding is that NAI needed to go a little bit further in terms of their construction review process so the bank could finalize their construction plans.
Mr. Matrana asked, is there anyone in the audience who has any questions on this matter? Being no one coming forward I will close the public portion and open it up to discussion among the board members with a possible motion.
Mr. McPhail asked, Mr. Carlucci does this path system meet the criteria that we need?
Mr. Carlucci said yes.
Mr. Kirchoff asked, has anything come up that caused us to make any changes to the motion?
Mr. Valanzano said no.
1.
The Development Plan complies with all applicable Development Standards of the district in which the site is located.
2.
The Development Plan complies with all applicable provisions of the Subdivision Control Ordinance for which a waiver has not been granted.
3.
The Development Plan complies with all applicable provisions for Architectural and Site Design Review for which a waiver has not been granted.
4.
The proposed development is appropriate to the site and its surroundings.
5.
The proposed development is consistent with the intent and purpose of the Plainfield Zoning Ordinance.
1.
Substantial compliance with the site plan, landscape plan, building elevations, photometric plan and light fixture cut sheets file dated October 21, 2005 and the wal-pac cut sheets file dated October 7, 2005.
2.
All signs shall comply with the sign hierarchy set forth in Article 5.5 of the Plainfield Zoning Ordinance.
3.
Pedestrian way connection to lot 1 shall be provided as part of the initial phase of infrastructure development for the Plainfield Commerce Center.
Second by Mr. Thibo. Roll call vote called.
Mr. Thibo – yes
Mr. McPhail – yes
Mr. Brandgard – yes
Ms. Whicker – yes
Mr. Kirchoff – yes
Mr. Matrana – yes
6-ayes, 0-opposed, 1-vacancy, 0-absent. Motion carried.
COMPREHENSIVE PLAN UPDATE
Mr. Valanzano said the Comprehensive Plan that you have in front of you is something that Staff has worked on for a few months with the help of Mr. McPhail, Mr. Haase and Mr. Kirchoff. Primarily this all started out with respect to the roadway corridor. We provided recommendations for a particular area, land use and transportation recommendation for the area along U.S. 40 and the Ronald Reagan Corridor with those two roadways coming together. Since we were into the Comprehensive Plan map and making changes for the U.S. 40 and Ronald Reagan area we decided to take a look at updating other areas in the Town based on recent land use determination of the Council and the Plan Commission and existing land uses. From light of some of the changes that we have made to the Zoning Ordinance in terms of some things that we have done and the lack of designation of having industrial we have those land use recommendations or proposed recommendations. We also have identified the planning area to the east between the Town of Plainfield and the Town of Avon. I would note that Monday night I gave you a copy of a letter from the Town of Avon that makes their position known with respect to some recommendations. I placed a letter from Browning Investments. Their primary concern seems to be the fact that some of the dotted lines, that we have on the map that I will get to in a few minutes, don’t line up exactly with some of those solid lines. Those dotted lines are for a reason. They are conceptual locations and if we need to, we can get into them in more detail. With that I think I will let Mr. McGillem go into a summary for you.
Mr. McGillem said I’m just going to summarize basically what we are presenting here tonight. It is the same thing that we went over in detail at our work session a couple of weeks ago when we got into a lot of specifics associated with how we got started and how we got to where we are, etc. I think what I will do is just skip through this pretty quick. I think pretty much everyone here in the audience who is interested in it knows these maps and what we have been doing more than one time. So, it shouldn’t be a surprise to anyone who is even in the audience here.
Essentially starting out here is the north approach out to Six points Road Interchange, Stafford Road, Ronald Reagan Parkway, which will continue north. Just north of Stafford Road it lays pretty much on the old existing Six Points Road alignment. One of our objectives here has been to tie down the full access points on the Ronald Reagan as we go north to U.S. 40 and even on up to CR100S. This has been decided to be done in conjunction with the overall Ronald Reagan Corridor study that was done by the joint committees on access control. I don’t know whether you can see it very well but this circle here is the intersection of Ronald Reagan Road, which is a signalized intersection. It’s, of course, the first full light north of the interchange. We go to this point here and this is a full access that has been approved associated with the Metro Air development, which is now under construction.
We will have an access here on Stafford Road and a connecting road coming around to the Ronald Reagan and this interconnecting road will serve both the full access for the Metro and for this corner parcel when it is developed.
As we go north on Ronald Reagan, here you see the Bright Pointe building. Right here is about the east end of the Metropolis Parkway that we had just finished or are in the process of finishing constructing. We are looking at the Metropolis Parkway continuing all the way across to Ronald Reagan Parkway and the Metropolis Parkway will be the next full access north on the Ronald Reagan.
Moving on north of there you have Airtech that continues up and makes a bend around a new building that Browning is completing.
The next full access would be Airtech and then it will line up with what was referred to in the past as the old United connector, which would go from Ronald Reagan over to the airport’s west perimeter road. It ties in at the old United facilities. That would be the next access.
Going on up Ronald Reagan you see a circle here, which has two little circles in the middle. What we are showing there is this large parcel that is subject to development where Ronald Reagan splits off and from the standpoint of this development we have looked and coordinated with the County, John Ayers and agreed that we would recognize the need for full access at that point initially. However, at some time in the future this, when all of the other interconnecting roadways are put in, this may need to go to a partial right-in/rightout only parcel access. But in the interim if this parcel kicks off developing and needing access, then we would consider a full access while that is being developed. The reason for that is because once Ronald Reagan goes through there is very little access that you can gain onto Ronald Reagan between Airtech and U.S. 40. So, there are additional accesses needed in this area until you start getting these interconnecting roadways in here.
Going on out to U.S. 40 the next full access onto Ronald Reagan, continuing north on U.S. 40, this is CR200 coming across. There was nothing going to be in between U.S. 40 and CR200 so similar to down here we are looking at most likely being, at least initially, a full access onto Ronald Reagan. Which, again, once other connecting roads are done this may end up going back to a partial right-in/right-out only access. We will have a full access onto CR200 and then north of there there will be about a half mile farther north a full access leading into a major development that will be occurring in this area. And then there would be a full access at CR100 and then the next full access would be U.S. 36 onto Ronald Reagan.
That pretty much identifies the access points in what we really started out to do. This area here is ADESA. One of the things that we tried to do with our update on our Thoroughfare Plan is create a network of roadway systems that is going to take advantage of this signal here that is existing. Of course, there is the new signal at Ronald Reagan and an existing signal out here at Raceway Road. The signal here at ADESA, once the Ronald Reagan comes through with an existing roadway system, this access on U.S. 40 will essentially only serve two dead-end streets. Basically, it serves ADESA and it serves old U.S. 40, which will be cut off and a cul-de-sac put in where Ronald Reagan comes through. In order to try to facilitate more access off of that U.S. 40 we want to see a connection and somehow get down to Airtech. We are looking at a connection getting across here where we are looking at this, at least initially, as a full access point that hopefully we can get all the way across and up to Raceway Road. This east/west connection getting all the way across we know is going to be very difficult, at least in this facility, because we have bat habitat, we have a creek to cross, and there are some pretty significant barriers there that we are going to have to deal with to accomplish that.
On the east of Ronald Reagan what we are trying to do is when Ronald Reagan comes through, you are looking at this whole area on the southeast quadrant only having access here at the old U.S. 40 access and also down here at the stub off of Airtech. Anybody living or working needing to get in this area, once Ronald Reagan is done, they would have to come across U.S. 40, get down on U.S. 40 and come over to Six Points Road and then get back down around. Or they would have to come down here at Airtech and come to Six Points Road. So, essentially we feel we have to do something to access these areas in here. As a part of doing that, we have gone back and we feel, in working with the County, John Ayers, we have them at this point agreeing that when Ronald Reagan comes through, to completely cut off Six Points Road at U.S. 40. At least to leave Six Points Road where it intersects into U.S. 40 as a right-in/right-out. You won’t be able to take a left getting out of there or getting on Six Points because of the new left turn median for Ronald Reagan and will extend beyond that Six Points Intersection. But we do feel, even by leaving that as a partial access on U.S. 40, a right-in/right-out, does provide some additional accessibility, which was not going to be had. So, we are working on that being tied in there.
Also, as I indicated, we want to see the ADESA signal tied in somewhere to the Airtech. This gets us not only from this signal down to Airtech, which will then get all the way across to the airport perimeter road but it will also give access all the way down to Stafford Road parallel to Ronald Reagan. It also gets us an access down to where the Metropolis Parkway will extend east/west across to help interconnect at that location in here.
We are seeing a lot of problems in this whole area in here currently with Six Points Road closed down until we get Ronald Reagan built. Airtech right now essentially is the only access through Stafford Road. That is becoming a very significant problem. As we get this through, we open up options for that traffic to distribute out of there. We think that is going to be very important in order to continue to have a reasonable flow in and out of the Browning development.
East of Ronald Reagan a lot of this property is owned by the airport, however, there are some large tracts being put in. They are being put together by some private developers in here. We would like, and we intend with our Thoroughfare Plan, to see that there is a north/south connection, again, from where Airtech continues over the perimeter road system and from Stafford Road. They interconnect in here so that we can maximize the full access points of Airtech, Metropolis Parkway, Metro Air and Stafford Road. This allows the openings in here to get through and eliminates the problems of every time somebody comes in with a development they all feel they have to have a full access onto the Ronald Reagan Parkway, which is not going to happen. That is kind of the overall network of what we are looking at.
I might go to the more detailed plan in and around U.S. 40. This here is sort of a blow-up of a little more integrate network of in and around U.S. 40. You have U.S. 40 coming around here and ADESA and the signal here at ADESA. You will have a new signal right in about here before the Ronald Reagan. On out you have the signal at Raceway Road.
Turning on the network that we are looking at this is the Perry Road signal here. This is Plainfield Commons Drive, we have a signal here. This is the old railroad corridor that comes down and this piece of roadway, solid yellow, is right now a private drive for ADESA that has been built to Town’s standards. The intent is at some time it may become a part of an additional network that would be taken into the Town. As part of the ADESA signal and working with ADESA, there has been discussion that there can be, and ADESA would be supportive, of a roadway from their signal up and along their east property line up to CR200. Again, this is part of the intent of making this signalized intersection of U.S. 40 a more extensive network rather than just serving a couple of properties. This also, by doing so, there is an elimination of being able to get into this residential neighborhood once the Ronald Reagan has gone up showing here with the red lines. Because it is going to be difficult to get out of this subdivision except for a right-in/right-out due to the left turn stacking up beyond this. So, one of the things that we are looking at is extending this roadway from ADESA and allows us to get an access point into this residential subdivision from this new connecting roadway.
Back to the west, as I indicated, there is a signal here at the Plainfield Commons. This is Andy Mohr Chevrolet and Andy Mohr Ford and there are developments being proposed here. We have been working and trying to coordinate for a potentially joint shared access for these developments in here to be shared off a signalized possible intersection with U.S. 40. That would minimize the full access points along U.S. 40 in here, which would then tie in to continue this ADESA drive over to Plainfield Commons and then over to CR900E. That is the basis for that network.
Going east is the old U.S. 40 coming through. This area between U.S. 40 and old U.S. 40 is a network of several very small parcels. One of the things that we are proposing, and you will hear on the next case tonight, is our desire at the location of the old U.S. 40 access to cut through an access onto CR251 and vacating old U.S. 40 through here, which opens up the potential of putting together larger parcels fronting on U.S. 40 for future redevelopment. Again, with that we are looking at the network of roadways coming in to tie all of this in and tie in with Ronald Reagan through this area, the same way up on the east side. With that unless there are any questions this is a clear overview of what we discussed in detail in our work session.
I would like to point out again that Raceway Road that comes down there is right now an intersection from Raceway Road to U.S. 40. Raceway Road is a major north/south corridor. We would definitely like to see that intersection serve the network down here and getting through and all of this open land down here rather than it just being a dead-end connection at Raceway Road.
Mr. Thibo asked, what is the schedule for Ronald Reagan Parkway going north of Stafford?
Mr. McGillem said it will be bid in December right now. It was October but it got moved to December.
Mr. Valanzano said a couple of minor things I wanted to point out is we have some additional land use designations in here, office/flex space. This is a new designation that we created for the Comprehensive Plan that did not exist prior. This is partly driven by the new district. We created the commercial/industrial district. We can see these areas designated to provide a buffer between the large box industrial development that we have going on in the Airtech area and Airwest. Also, we are using it as a buffer between what may become a large box type proposal but on the northwest of this particular area as a transition from the commercial that would be developing on U.S. 40 into those areas. This is also consistent with development that we have going on in the area.
The other big difference we have on this plan is right now through the land use plan for the Town of Plainfield we do not have good (inaudible). Secondly, we do have some land uses in Town that we would like to be able to relocate, if possible, Plainfield Ready Mix and some other types of operation. This would seem to present an ideal location with the airport activity on the east side, Shrum Mobile Home Sales in this area and then the airport. This would seem to be an ideal location to be able to put those type of uses within the boundaries of the Town of Plainfield. So, we have added that designation and identified it primarily in this location.
Mr. McGillem said I would like to point out that these lines on here are concepts. They are not fixed alignments and there are certain points on these lines that are fixed at specific intersections, etc. just like the ADESA intersection but as far as the alignment goes just as we have always done with any other parts of our Thoroughfare Plan we will work with landowners and developers, etc. in tying these lines in to work within their development intent. But still serving the intent of the overall Thoroughfare Plan as it was set up to accomplish.
Mr. Valanzano said this is a revised Comprehensive Plan with the two new land use designations recommended to being made. You have on page 5 of the draft report a summary of the major changes to the plan. Primarily the changes to this plan deal with the area along the Ronald Reagan Corridor. We are showing a more accurate alignment for the Ronald Reagan Corridor coming in. Here is a heavy industrial designation that we talked about. This blue/pink cross-hatching is indicative of all this office/flex space, which is a higher class industrial development that is consistent with some of the other areas recommended for industrial development. It also provides for the areas that face along the corridor. It also provides for buffering for some of the existing residential areas that are on the west side of the corridor recognizing that there are some existing residential along the east side of the corridor. So, we have identified what we call appropriate places for buffering based on land use recommendations and still providing reasonable opportunities for development in those areas.
We made some changes in the land use recommendations between Stanley and Hadley. This area has been shown for medium-density residential east of the school property. We have made the school property more consistent with reality in terms of what has been purchased by the school and what has been zoned for development for the Plainfield High School. We had changed this recommendation from medium-density residential to a commercial designation consistent with zoning in the area and anticipated development in the area.
Also, we made some adjustments on both sides of Stafford Road to reflect existing neighborhood commercial where the Marsh area is and on the south side where the Chase Bank is south of Stafford Road.
We have shown Metropolis Parkway and recommendation coming through. We have also shown where the mall is being developed. We know it is commercial now so, as opposed to showing it as commercial/residential high-density mixed use, we are showing it for what it is. This area where the Wal-Mart is we have changed that designation. The area south of that actually had a light industrial recommendation through this entire area where Crown Plaza and Gladden Farm Apartments are. So, we made those changes in this area to reflect the Wal-Mart development and a likely re-development of the mobile home park that exists south of Wal-Mart and to be a little more reflective of the existing conditions.
When you get up into this area, this is where Mr. McGillem talked about the ADESA drive extension. With the amount of commercial traffic that is likely to come through that area that is Plainfield Commons Drive and it would extend as the intersection where Andy Mohr Chevy and Ford is and bringing a road back to that connection and coming down to Smith Road. We felt it would be appropriate to put a retail/office mix use designation in there indicating that it would be appropriate for some light retail development or office development to occur in that area as opposed to continuing the low-density single family recommendation all the way down the railroad tracks and then having what can end up being a fairly major roadway transmit to commercial traffic.
With that we have also shown on a recommendation to expand the Town’s planning area and boundaries up to the north along Raceway Road south of the railroad tracks. There is the Sun Chase Subdivision in this area, which is already being provided with Town’s sewers. We thought it would be appropriate to extend the planning boundary for future consideration should annexation ever be considered in that area for residential since the Town has the ability to provide the services. We are also showing an extension about a half mile west of CR900E. There is a proposed development talked about in this area.
There is an existing relatively large residential area down here. We are proposing an extension of a low-density single-family residential development in that area. You have a letter from the Town of Avon where they made some suggestions that their comprehensive plan called for through this entire stretch for buffering. Our thought is when you look at the aerial photography for the area, from this point north it is pretty much farm fields and significant natural features. The area south of this point coming down in this area there is a stand of woods here. There is a little bit of, I’m not sure if it qualifies as a creek, and residential in there. Our thought is that this area to the south will be residential considering the features that are there and the existing use it probably makes sense and being low-density if development occurs, those features would more than likely be preserved. Secondly, our Zoning Ordinance requires that any commercial/industrial development within 600 feet of a Residential District must come before the Plan Commission for review and approval for an Architectural Review. And if there is a need, we can impose whatever requirements are necessary to provide appropriate protections. We can also tailor those protections based on the design of what the building or development is that is proposed. If it is a high-quality office development, not nearly as much protection would be needed. If it is a heavier industrial type use with loading docks, probably a much more significantly landscape screening would be proposed. This does nothing to jeopardize per se our ability to impose appropriate screening. So, I think we have the ability under our ordinances and procedures to be able to accomplish what is being proposed.
Mr. McGillem said there have been discussions, as we met with some of the landowners and developers just east of Clover Drive and south of U.S. 40 on old U.S. 40, showing your office/flex. There have been discussions along that frontage of U.S. 40 whether it should be office/flex or commercial.
Mr. Valanzano said and possibly bringing commercial all the way down and changing this entire area with the justification being that this is going to become a major interchange or intersection and what more logical place to put retail/commercial development than there. Our feeling is that the U.S. 40 and Ronald Reagan intersection is a place for growth (inaudible). Also, the way that we are looking at it with the major full access, permanent access to Ronald Reagan being Airtech at this location, we really see this road as being more of a connector route that provides connection between what would be the proposed development. We were just talking CR200 through here and down all the way to Stafford Road and being more of a road that serves a lot of industrial areas and industrial developments along the way. That being the case from the prospective that we were looking at in terms of where the traffic flow would be coming through we felt that the office/flex designation in these areas were appropriate. It’s not to say that can’t change as development occurs in this area. Conditions are such that if it is appropriate to reconsider that, we can always do that at a future date. We felt these recommendations at this point and time are reasonable considerations.
We have some other graphics that are in your package that really in terms of the Thoroughfare Plan are just added and some of the things that we talked about here.
Mr. Kirchoff asked, didn’t you also expand the planning area southwest?
Mr. Valanzano said we did not expand it to the southwest but we made a statement in this Comprehensive Plan that after a study would be to look at what should be done in that area. We had some discussion about that in our meeting but we didn’t want to slow down the process of getting this portion through. And I believe one of the last paragraphs of the text that you have in front of you, after this is done, we will step back and see if there are other areas that we need to look at.
Mr. McGillem said probably in the meeting where we have had the biggest difference in what we are showing you is the last aspect that Mr. Valanzano has kicked out is the discussion of whether or not the General Commercial should come down south of U.S. 40 farther to that first east/west connecting road going across there. We have some office/flex space that is shown in there in areas right now within the County that is within an area that is already zoned General Commercial. We are talking about office/flex space instead of commercial so that probably has been as much controversial as anything as we have met with landowners and developers in what we have been putting together.
Mr. Brandgard said just as a comment, the office/flex and retail/commercial if the office/flex is done properly and right, it can blend. We certainly don’t want the big boxes down there along U.S. 40 but the office/flex you can make blend in with what you have pretty well, at least on the frontage. I like Mr. Valanzano’s comment relative to the Comprehensive Plan. It is a plan that we try to follow as much as possible. We also know that it is dynamitic, it’s not static. The same thing with the roadways in there. We need to indicate the intent in how they exactly follow. In most cases is not too important as long as they follow in some way. I’m going to ask Mr. Valanzano to do something, if you would. As we go forward with this, would you write a letter on the Town’s behalf to the Town of Avon and respond to their letter as the planning director explaining how we operate relative to the area that they are talking about.
Mr. Carlucci said there is supposed to be someone from Avon here tonight. They have a council meeting but I thought their planning director was going to come down here. Is there anyone from Avon here?
Mr. Brandgard said I guess since they responded with a letter we ought to respond back saying that we recognize what they are saying and we agree but we do it a little bit different designating it as such but we do put the buffers and stuff in where needed. We seem to be working pretty well together, the two communities and I certainly don’t want to do anything to push that effort aside.
Mr. McPhail said this whole process started out as a Thoroughfare Plan and as we started looking at our Thoroughfare Plan, which we think we really need to get adopted and the sooner the better. We did get into some land use and some redevelopment areas particularly in an area along U.S. 40 and east of Ronald Reagan. We have a project in that area later on in the agenda but that particular area has really some unique aspects there that we really need to focus on the area and make sure that whatever we do there blends in with this master plan. There are so many little bitty parcels, the old railroad, the old highways, there are more parcels in a few acres than there are all over Town I think. So, it really brought to light, and the development that we are looking at tonight, those issues to light.
And then with the development of Ronald Reagan we felt like there could be some updates to some of the land use plans that we adopted prior. That area particularly that Mr. Valanzano mentioned south of U.S. 40 where do you break the office/flex and the retail/commercial? I think this Plan Commission has used this comp plan as a guideline and as development comes along a lot of that area is to be flexible. I think reasonably good quality development regardless whether it is office/flex or commercial will get a fair hearing. I don’t think you can draw a line there today and even feel comfortable that you have it at the right place. Because some of it is going to depend where the roadways end up and where we get right-of-way to do that and tie them together and how development goes particularly along U.S. 40, right at that intersection. We obviously know it is going to be commercial there. We have the overlay of the Ronald Reagan plan and we have developed through the County some things that just really doesn’t fit in that intersection. You can’t go 1,000 feet both ways and not have any of these things that we are talking about. It is a unique area that we need to be pretty flexible with. Whatever we adopt, as a Comprehensive Plan, we need to be very flexible that way as we move forward and as we see development coming in. Some of the old stuff that is there may be redeveloped. They may want to add to some that is already there. So, it is kind of a complex area. It is not nearly as simple as you get away from there and start looking at really what belongs there because that area has to be somewhat flexible I think.
We have had lots of discussions with some of the property owners and potential property owners and potential developers. I think Mr. Valanzano and the Staff have done an excellent job in trying to bring in people to look at this thing before we got to the public hearings on this. We had a public meeting two weeks ago or three weeks ago and went over it and looked at that. That is the area that I’m talking about that is really complex in terms of trying to get quality redevelopment in the area. It all needs to be redeveloped.
Mr. Kirchoff said as we talked at the work session, I’m not sure what it takes but I sure would like to see the Town be more active and vacate U.S. 40 and get started. And I don’t know if we need to say something to the Redevelopment Commission or who but I would like to see us be proactive in that area. Let’s clean that area up. It is going to be the entryway from the east. It ought to be a positive image when people are coming down U.S. 40. If there is something that the Town could do to make that happen, I think we should.
Mr. McGillem said the thing that we are trying to get away from here again, as indicated earlier, is highlight not only on the Ronald Reagan but U.S. 40 through here where we want to have major access points. As you can see, all these little parcels fronting on U.S. 40 the last thing that we want is a commercial development on every one or two of these developments and all of them having to have their access directly onto U.S. 40. This is the message that you have on U.S. 36 right now and we need, as this redevelopment comes in, to clean this up and not to continue to enforce that kind of access problems through there. I had talked to INDOT about vacating old U.S. 40 and we have a large chunk of land that they own in that triangle right there where old U.S. 40 comes in to new U.S. 40. They are very willing to work with us. Mr. Valanzano and I sort of have some tentative plans associated with that. We kind of need to work with Mr. Daniel and also with INDOT as to the best way to accommodate this vacation process through there. That is something that we need to get initiated. I think that you will hear that also in the last case to be presented to you here tonight.
Mr. McPhail said I will just comment on the area where ADESA is. We have that signal now and obviously until something happens we have the two dead-end roads but that is another area, and I think I touched on it, that has a possibility of going a couple of different ways in terms of development both north and south. That could end up being a pretty major commercial area north and south off of U.S. 40. I think when you get very north or south, it is definitely going to change depending on Metropolis and what it continues to draw in terms of supporting retail. I really think the Metropolis is going to continue to draw more retail so we are going to have some more commercial areas developing there within that general corridor area. I think we just have to be flexible in those areas.
Mr. Matrana asked, is there anyone in the audience who would care to speak on the Comprehensive Plan update?
Mr. Wamsley said (inaudible).
Mr. Matrana said being no one else coming forward we will close the public portion of this hearing.
Mr. Kirchoff made a motion to approve Resolution No. 02-2005, a proposal to amend the Town of Plainfield Comprehensive Plan as set forth in the Town of Plainfield Comprehensive Plan Supplement No. 1 draft dated October 7, 2005 with attachments and forward such amendment to the Town Council with a favorable recommendation. Second by Mr. McPhail. Roll call vote called.
Mr. Thibo – yes
Mr. McPhail – yes
Mr. Brandgard – yes
Ms. Whicker – yes
Mr. Kirchoff – yes
Mr. Matrana – yes
6-ayes, 0-opposed, 1-vacanacy, 0-absent. Motion carried.
Mr. Matrana said the next matter before the board is DP-05-027, Joyce Hoyt.
Mr. Valanzano said the next and last petition that we have on the agenda tonight is Architectural & Site Design Review approval along a Gateway Corridor for commercial development for approximately 9,540 square foot retail facility. The site that we are talking about for this project basically is in this area here. It is part of the chopped up parcels that Mr. McPhail alluded to a few moments ago. As a part of this proposal, in order to be able to develop this site with a modern type retail center the petitioner also needs some variances at this point and time and a vacation petition on a portion of the property. So, the reason that I put the site plan up is not necessarily for you to have to identify anything in particular but this is where existing old U.S. 40 comes through and turns up to new U.S. 40, which is right here. The only way this development can fit on the property is to come in here and hang an immediate right when you get through the curve cut. In this area in the pink really abuts the right-of-way, the existing right-of-way. The area in yellow is an access drive within the required 30-foot setback. Those areas need a variance in order for this project to be developed. A variance petition is on file and will be heard by the Board of Zoning Appeals later on this month.
The area in blue is the area that Mr. McGillem was talking about earlier that is appropriate for immediate vacation. That area sits right here. Here is old U.S. 40 coming into new U.S. 40. The vacation petition that is on file would take from this point to what would be the east right-of-way line up old U.S. 40 coming through and down to the petitioner’s property and onto the property that is located to the east. They have both co-petitioned for the vacation. What that would do is allow that area in blue, at least this portion of it, be incorporated into this site for this petitioner, which would mean that we would no longer have an encroachment of a parking area into the public right-of-way. And we don’t have an encroachment of a parking area to require a setback and all development standards don’t fall into place.
At some time in the future when this road is taken out and we can punch the road through that Mr. McGillem was talking about earlier, from new U.S. 40, this is where John Pearson was proposing the auto dealership a few months back. We are proposing to bring the road through at this location and just skirt the west side of the relatively new building and come into 251. That would provide the main access into 251 and through this area. Once the road gets from here to over here we will no longer have a setback issue here. As this roadway would get vacated in the future this portion of the property would get incorporated into the site and as we implement the plan that we were talking about a few moments ago the variances that we were talking about now to vacate, all of that stuff will fall in place. And this development will end up complying with developments standards as opposed to relying on variances that we are talking about right now. Variances are needed for this project to be able to go forward now as opposed to having to sit on the back burner.
One of the critical things that we want to make sure you understand and are comfortable with is we believe that this plan can go forward and will not hinder or impede or otherwise interfere with the recommendations that are contained in the plan that you just recommended to the Town Council.
Mr. Kirchoff asked, do you feel this is consistent to where we want to go to redevelop the entire area?
Mr. Valanzano said it is possible that a bigger development could occur here. We are talking about a 9,000 square foot retail center. The development that we just looked at at Stafford and SR267 was a 12,000 square foot retail development. There is not a whole lot of difference to be honest with you in terms of the size.
Mr. Kirchoff said I think it is more of access.
Mr. Valanzano said when this road comes through, the access to this site will come out at this location. It will be several hundred feet south of U.S. 40.
Mr. Kirchoff said I guess where I’m going is can we put some conditions on this tonight, if we were to approve it, that says when that happens, that other one has to be closed? Is there a way for us to put a condition on it that when the other access is created, that has to be vacated, has to be closed? Am I thinking right?
Mr. McPhail said I think you are thinking right and I’m assuming that we have the right to impose those kind of conditions.
Mr. Kirchoff said but we want to do that tonight.
Mr. McPhail said I really think in going through this with DRC a couple of times that the petitioner has worked hard to try to get their project now and make it fit in with the comp plan. They’ve been to DRC two or three times and TAC probably a couple of times to try to make this thing work. I really believe it will and I agree with Mr. Kirchoff that we need to stipulate that once we get that other roadway it gets closed off or we will have a worse mess than what we have now.
Mr. Kirchoff said we have to be thinking futuristic. I don’t see that in there Mr. Valanzano.
Mr. Valanzano said it’s getting in there right now.
Mr. McGillem said this tract will we want to cut through 251? There is not much else that you can put in. This is as large of a tract that you are going to be able to put together.
Mr. Kirchoff said I think Mr. Valanzano addressed it when he said we pretty much know where the other entrance will go. Is there any chance that it could move significantly that we would miss the mark here?
Mr. McGillem said what we would like to do at this time, to be very honest with you, is as we are working with INDOT to get this piece vacated, we would like to be going ahead working with INDOT to get this access here and even going to the extent of appraising this. This piece that we are taking off the east end is this whole triangular piece. This guy is not going to move, he is not going to vacate it, we are going to have to take this piece. We would like to go ahead and get that piece identified and acquired in order to get us the access through to 251. What that does for us is this guy’s current drive comes off of old U.S. 40 right here. As part of coming through here, we can reconnect his drive and let him stay there but connect his drive to this new connection at 251. By doing that there is only one other parcel in here that has access onto old U.S. 40 and that is this one here and it is up for sale. We would like to be able to get that parcel also. That allows us to go ahead and vacate all of U.S. 40 because we have no more parcels depending on access to old U.S. 40. So, I guess what I’m saying is we would like to go ahead and make this happen. We are confident enough that they are to go ahead and make it happen and going ahead and securing that right-of-way and getting it punched through there, which then gives them the access that they are proposing off that connection also.
Mr. Kirchoff said as you know, I really trust your judgment. I just want to make sure that we thought that through and we didn’t come back in six months and say it really ought to have been this way.
Mr. McGillem said I don’t think we want it much closer than this because we are wanting also to keep Six Points Road right here left as a right-in/right-out. Six Points Road is an integral part of the whole development of this whole area down through here.
Mr. McPhail said I think one other issue there too is the parcels that Mr. McGillem alluded to the fellow doesn’t want to leave. I can totally justify taking the end of his property. If we wanted to go farther west and go through it, I would have some difficulty. Going down the end of his property we would end up giving him as much as we would be taking by vacating the old road and I can really justify that. But going through the middle of his property I probably couldn’t do that. It makes sense where it’s at.
Mr. McGillem said I think the big thing that we ought to do is get the old U.S. 40 vacated. Otherwise, you are never going to develop any frontage lots that are of any meaning as long as old U.S. 40 continues to split them.
Mr. Brandgard said as Mr. Kirchoff said, I think we need to be proactive and maybe develop a plan to make that happen.
Mr. Kirchoff said we have charged Mr. Valanzano with that at a work session.
Mr. McGillem said this even goes back to what we talked about on the Comprehensive Plan and Thoroughfare Plan when they were wanting to look at south of U.S. 40 as a GC site. Our position is that the first area that is going to develop General Commercial on Ronald Reagan is the circle right around U.S. 40. As long as they can put parcels together enough to make them work in that area. And then depending on how far GC depends on how it builds and radiates out front of the U.S. 40.
Mr. Valanzano said another thing in this particular area the way that we see the road never coming together and the size of the parcels we have new U.S. 40 coming through here, we punch a road through in this area, one of the constraints about the location was some of the relatively new investments that were made in the area in trying not to disturb them. This does make a relatively logical location. Relatively equally spaced in terms of access points on U.S. 40 so from that it works pretty well. There was a question of whether we would look at keeping an alignment keeping that road to the north? Mr. McGillem’s feelings were these are going to be a right-in/right-out. There is going to be a median in there anyway. That is not going to be a critical issue so moving is not going to hurt anybody. So, if you took all of that into consideration, the development in this area we are looking at old Six Points Road coming down, 251 coming across, the new route coming through into 251, basically these areas being able to be developed at somewhat like the larger outlots that you see in front of Targets where you have some of the strip centers coming in and developments of that nature. We can almost see this as being a front door type outlot development area to what could be larger land assemblages redevelopment to the south.
What we are looking at here and what could end up through vacations and everything included up to the right-of-way of new U.S. 40 down through this location and over the development that you see here today would really be one piece of that type of development. Could there be bigger developments in the area? Yes but that doesn’t mean that this development couldn’t fit in this area and then some other development back here and maybe this development expand into that property to the south in the future.
Mr. Kirchoff said that discussion helps me because I just didn’t want us to be short-sighted.
Mr. Valanzano said the petitioner wants to put up a primarily brick and EIFS retail building. I believe you have color renderings in your packets. The petitioner has made some adjustments to the building elevations per the recommendation of Staff and DRC and the rooftop mechanical units will be screened from all directions and we won’t have to worry about seeing those. They have made alterations to the facade of the building on the sides and the rear to bring more brick around to be more consistent with the recommendations of the Design Review Committee.
They have also worked with us to revise a landscape plan and making some revisions there. The one thing there was a recommendation from Elaine Taylor that the Sugar Maple be replaced with Red Sunsets and they have just agreed to do that.
Lighting levels comply and the type of fixtures that they are using comply with all of our standards. They are the full cut-off fixtures.
They are proposing one ground sign. This would be a small integrated sign. They are proposing a small 60 square foot ground sign as the sign for the center. The signs on the building would comply with our guidelines being either individual letter signs or small window signs.
And we have gone through all the transportation stuff that I was going to bring up to you.
Just a couple of things to let you know this is the existing driveway that I referenced in the Staff Report. When this development goes in, that driveway will not be used. It is our position that should be curbed off across there and that drive should be completely removed in terms of being turned into a front yard for the center. That is located right at this location of the sight. The comments that I made on the drive is what I’m referring to.
The comments about the dumpster location is the only thing on the site that is relatively small in type. The dumpster is being located at this point. It meets all their guidelines. There will not be any issue or any problem. When this road goes through, that would then be between the front line of the building and the front lot line, which would not be permitted. That would end up being the only aspect of this development that would fall out of compliance as opposed to everything else that we are talking about falling into compliance. That is one issue that would fall into compliance. I wanted you to know that would become a non-conforming status.
Looking at the sight, to be honest with you, I don’t know that there is another place that we could put it. With that I know the petitioner has a presentation. We spent a lot of time on this but they have worked with us over several or many months, almost a year now, working with this project. They have been quite patient to let us go through and get all the plans together. They have done what they could to work with us so I wanted to give that acknowledgement to them for their efforts as well. With that I would be happy to answer any questions.
Mr. Deer with Lewis Engineering at 315 E. Main St. said I don’t have anything specific. I think Mr. Valanzano summarized our project well. I could answer any questions that you might have. I have some slides and a site plan on Power Point if there is anything that you would like to ask. It’s nothing different than you have in your packets.
Ms. Whicker said for clarification, retail center/office space, maybe it is just the sign but I think of office space for leasing.
Mr. Deer said the intention is for retail. It is zoned commercial. We are not really thinking that there will be any office space there.
Mr. McPhail asked, how did you come up with the name?
Mr. Deer said it was not me.
Lady from the audience said with the airplanes coming in it is in front of the landings.
Mr. Carlucci said the Town has received a petition to vacate right-of-way. Would you point out that right-of-way that you wanted vacated.
Mr. Deer said there are actually four pieces because they will actually go to four different places. The total right-of-way is along here. Actually it is more towards here and it goes out in front of Bill Sodrel’s body shop. This piece is half of the U.S. 40 right-of-way, which adjoins our property. This part technically would be joined to this little INDOT triangle here and then Bill Sodrel would get a piece in front of him.
Mr. McGillem said I might point out with my meetings with INDOT and having had a lot of discussion with Mr. Daniel on it INDOT doesn’t want that piece of right-of-way. All INDOT wants is to maintain their straight right-of-way that you can see the 60-foot right-of-way continuous down U.S. 40. INDOT is indicating that if we can work some way to get a quick claim or something to the Town for that piece that lays between the apparent right-of-way on U.S. 40 and old U.S. 40 since the existing old U.S. 40 is in the Town right now, the Town would have the small triangular piece. So, when we vacate that right-of-way rather than it going to INDOT, which they don’t want, it would be left up to the Town to do what it wants to with it. Essentially what they have indicated to Mr. Kirchoff and I when we were in a meeting with them, is there some way to get that one triangular piece there quick claimed some way to the Town? That leaves them with the right-of-way they want for U.S. 40 and they would be giving us the other side. So, before we go through the vacation process we need to look to see if there is something that we need to do there.
Mr. Valanzano said the petitioner has provided us with a legal description for that particular parcel so all the engineering and survey type work for that is taken care of. What we need to do is figure out the form of that deed or quick claim.
Mr. McGillem said otherwise when we vacate it, that piece goes to INDOT.
Mr. Carlucci said I planned on presenting that to the Town Council on Monday night. The Council can indicate to go forward but we will have to figure out how to handle that little triangular piece. I just wanted some clarification.
Mr. McGillem said at the same time we are quick claiming this right here INDOT also owns this piece over here outside of old U.S. 40, this triangular piece in here. We want to do the same thing on it also.
Ms. Whicker asked, is that portion surveyed yet?
Mr. Valanzano said no. Like Mr. McGillem said there is that one other parcel that had the frontage onto old U.S. 40. If the Town could acquire that parcel between that ownership and other people that we have been talking to with Pearson’s property that they own west of that little triangle, the last one that we just talked about and the motel site, there is probably a very good possibility to be able to get a good chunk of those dominos and get into place pretty quickly.
Ms. Whicker asked, what is the timeframe on a quick claim?
Mr. Daniel said it is really a question of how quick the State can get it signed for us. If there is any delay, it is getting a signature.
Mr. Carlucci said we can’t quick claim it to ourselves. INDOT is going to have to sign something.
Mr. Kirchoff said but they are eager to make that happen.
Ms. Whicker asked, after the quick claim deed will it become property of the Town? Is that something that the Town would hold onto or something that the developer would want to have?
Mr. Valanzano said I thought we were talking about being able to flip that to a developer to help make their site more valuable.
Mr. Brandgard said we don’t want it.
Mr. McGillem said it’s not anything that we want to continue to maintain as ownership. We want it to be in our hands to where we can control getting it into the developer or landowner’s possession that is developing that piece of parcel.
Ms. Whicker asked, do we sell it or give it?
Mr. Carlucci said it won’t cost us anything so we wouldn’t charge someone else. We are trying to get rid of that whole old U.S. 40.
Mr. McGillem said ideally the triangular piece here that we are talking about vacating would be to go to this petitioner as an additional front yard area.
Mr. Valanzano said this property could easily end up coming up and across the south right-of-way line down. That could end up being the front parcel, which will take off a lot of the constraints of the design of the parking area in this area, access coming in at an appropriate location in here and the parking field can be squared up. If you take this line across, the parking would probably be out to an area somewhere around here. I’m not sure there is enough space out there. You would have to do a lot of redesign in parking to get utilization out of that but that is likely what would happen. This whole area would be a more efficient assemblage for parking for the site.
Mr. Kirchoff said that is kind of what I was trying to say earlier. Should we not plan for that project to look like that?
Mr. Brandgard said what we are talking about here I don’t like to get into planning a project but at the same time at what we are attempting to do here if those two parcels that belong to the State could go with this parcel here, that building could be aligned so that it is right with U.S. 40 instead of being off at an angle and repositioned on that lot, which would be helpful to everybody.
Mr. Daniel said some other pieces would have to be in place first.
Mr. Brandgard said yes. Doing that is beneficial to the Town and also to the developer. We can’t change anything until all of that happens.
Mr. Deer said our biggest concern is timing. The contract for this job was signed in January and here we are in November.
Mr. Brandgard said we aren’t wanting to slow you down. There are some possibilities that you may want to look at as we do this.
Mr. Deer said at one time our site plan had two scenarios in it. It had “now” and “future” and that could kind of be confusing so we decided to just focus on “now”. We do have plans to kind of simplify the parking and make it more what you would traditionally expect and take out some of these unique arrangements.
Mr. Kirchoff asked, if you had other land that we are talking about, if you had that today, would your project look different?
Mr. Deer said it would look somewhat different yes.
Mr. Brandgard said it depends upon how much additional time they want to delay.
Mr. McPhail said the problem is how long is it going to be (inaudible).
Mr. Brandgard said even with that you could still leave that opening into there as an entrance until you get the road in.
Mr. McGillem said I think what they are jeopardizing by not being able to wait or the timing element is they could probably get a few more feet on this parcel and still meet all of the standards and develop. I think it is a time element for them in having to recognize if they go forward with a plan like this they are pretty much tied down to this size building. They are going to have a lot more flexibility from the standpoint of their parking spaces of being somewhat expanded for some parking along here in their front yard out to U.S. 40. But I think the biggest thing that they are doing is possibly giving up some additional square footage that they could have on this site if they had this additional land.
Mr. Kirchoff asked, wouldn’t it be possible for us to give them some other variances knowing this site is going to change and that we approve it for what it could be? Is that risky?
Mr. Brandgard said yes for both parties.
Mr. Carlucci said it’s not ideal but as we flip that land over, before we flip it over to them, we say that is what you have to do with it. We have an agreement so if there is some landscaping or things that they could do to make it better, we don’t want to give them a piece of property and have it worse, which I don’t think that is what they are planning but I can appreciate the fact that they do want to move forward.
Mr. Valanzano said I don’t know if this is an appropriate idea or because I haven’t fully thought it through yet but one thing that you might look at is an approval of this with the understanding or statement that if we can pull off enough of the vacations of old U.S. 40 and acquisition from INDOT of those parcels where they can be incorporated in this site in a timely……………
[Tape concluded and resumed as follows with Mr. McPhail speaking:]
………………So, what you are suggesting is that we approve this with a condition administratively and if in a timely manner we can dedicate some of that right-of-way…………
Mr. Valanzano said right. If we can get the quick claim deeds out of INDOT and get the vacation done in a reasonable timeframe for what they are looking at. They still have to go through a vacation process through the Town Council just to get this to work. So, the Town Council still has a say before the trigger gets flipped and this project can move forward. The BZA has to vote and so does the Town Council. The Town Council will have the opportunity to say to give us another two weeks or whatever it takes to get something done. And then as a result of that, we can then work with them administratively. As long as we have a site plan that is in compliance with development standards and that you are comfortable with we can do some shifting of the building, shifting of the parking areas to make it work and address all of those issues that you were talking about. And maybe get a building that addresses U.S. 40 a little bit better by moving it up closer.
Mr. Kirchoff said I don’t want to compound it but we are on the verge of improving a site to give them a better project. That is all that I was trying to say.
Ms. Whicker asked, would we need to define “timely manner?”
Mr. Valanzano said I think the Town Council could control that through the vacation process they would have to go through.
Mr. Brandgard said I think somewhat the “timely manner” is when they have to start construction to do something.
Mr. Daniel said I think “timely manner” might also be controlled by the petitioners too. If we get into some delays with the State, they may be in a position to say we really have to go ahead on this.
Mr. Carlucci said I have a friend in the Attorney General’s office and I can get that moved pretty quick. We rarely ever do this because we could ask them every month for something but I haven’t asked for something in a couple of years. We will do everything that we can.
Mr. McPhail said this is what we want in that area. We want redevelopment. We want good redevelopment. You’ve got a good project. We can make it a little better.
Mr. Carlucci said Elmo Gonzales is the liaison in this area downtown but sometimes that is where it gets hung up too because INDOT has to sign off.
Mr. McGillem said Mr. Gonzales was at that meeting.
Mr. Carlucci said we will give it a shot. It may work or it may not but we will try but at the same time we don’t want to stop then.
Mr. Matrana asked, is there anyone in the audience who would care to speak on this matter? Being no one coming forward I will close the public portion of this meeting and open it up for the board for discussion or a possible motion.
1.
The Development Plan complies with all applicable Development Standards of the district in which the site is located.
2.
The Development Plan complies with all applicable provisions of the Subdivision Control Ordinance for which a waiver has not been granted.
3.
The Development Plan complies with all applicable provisions for Architectural and Site Design Review for which a waiver has not been granted.
4.
The proposed development is appropriate to the site and its surroundings.
5.
The proposed development is consistent with the intent and purpose of the Plainfield Zoning Ordinance.
1.
Substantial compliance with the Site Plan file dated October 21, 2005 provided that the final Site Plan shall indicate the removal of the existing asphalt drive at the far east end of the property, the closing of the curb cut and the return of the area to yard.
2.
Substantial compliance with the Building Elevation and Rendering file dated October 21, 2005.
3.
Substantial compliance with the Landscape Plan file dated October 21, 2005 provided that the Sugar Maples in the parking lot are replaced with a hardwood maple variety.
4.
Substantial compliance with the Site Photometric Plan and the light fixture cut sheets for LSI Patriot Series 400 watt metal halide full cut-off Challenger series wall sconce light and a Sovereign recessed canopy light as presented to the Design Review Committee.
5.
Substantial compliance with the Ground Sign Plan file dated October 21, 2005 amended to include required sign base landscaping.
6.
Building signs shall be either: (a) window signs or (b) individual letter signs located on the EIFS portion of the building over the tenant spaces.
7.
When a new roadway is developed along the west property line of this site, that the current access to old U.S. 40 from this site shall be closed and a new access shall be provided to the new roadway subject to approval of the Director of Transportation.
8.
The final Site Plan may be amended to incorporate vacated portions of old U.S. 40 subject to the Director of Planning approval.
Second by Mr. Brandgard. Roll call vote called.
Mr. Thibo – yes
Mr. McPhail – yes
Mr. Brandgard – yes
Ms. Whicker – yes
Mr. Kirchoff – yes
Mr. Matrana – yes
6-ayes, 0-opposed, 1-vacancy, 0-absent. Motion carried.
Mr. Brandgard said I would like to thank you folks with bearing with us on this as we have gone through this. We don’t normally do this but this is an opportunity, as we said, for the chance of redevelopment and you only have a chance to do it right once. Again, you brought something in that I think is going to be an asset in that area and we would like to try and enhance it as well as enhance the whole area, if we could, so I thank you for bearing with us.
OTHER BUSINESS
Mr. Brandgard said I think we all had in our packets a letter from the Ronald Reagan Corridor Master Plan Steering Committee that was signed by Ed Schrier, President of the Hendricks County Board of Commissioners and Larry Hesson, the Hendricks County Council asking that the various agencies adopt the Ronald Reagan Corridor Master Plan. We have had several conversations with the Indianapolis Airport Authority and I think we are very near an agreement, which effects this overlay corridor area. Once we finalize that agreement I think we will bring this back in for our approval and agreement to the overlay. I wouldn’t want to do it before that. I think it is a case where the airport authority and the Town both I think it would be very neat if we could both have a signing ceremony of sorts where both agencies sign it together. I just wanted to give you an update where we are on that.
Ms. Christine Owens said I’m the Planning Director for the Town of Avon and I apologize for my tardiness this evening. We had a council meeting and I had an agenda item that took just a tad longer than we had anticipated. I understand that our letter was read into the record for your consideration and I do thank you on behalf of the Town of Avon for considering our comments with the future land use map that you were amending this evening. I just wanted to take a minute to introduce myself. I’m sure we may run into each other again some day. Thank you for considering our comments. If you have questions for me, I’m always available. Thank you.
ADJOURNMENT
Mr. Kirchoff made a motion to adjourn. Second by Mr. Brandgard. Motion carried.
Meeting adjourned.
Mr. Rick Matrana, Acting President
Search
Search is currently limited to:
  • Department: Planning and Zoning
Meeting Minutes
Plan Commission Meeting
March 1, 2010
Plan Commission Meeting
February 1, 2010
Plan Commission Meeting
January 4, 2010
Plan Commission Meeting
December 7, 2009
Plan Commission Meeting
November 2, 2009
Plan Commission Meeting
October 5, 2009
Plan Commission Meeting
August 3, 2009
Plan Commission Meeting
July 6, 2009
Plan Commission Meeting
June 1, 2009
Plan Commission Meeting
May 4, 2009
< Prev · 1 2 3 4 5 6 ... 10 · Next >